Step 5 - RemoveCurrentBackplate
Unscrewthecurrentbackplateand
removeitfromthewall.Becareful
not to let the wires fall into the wall.
Step 6 - MountNewBase
1) Gentlyseparatethedisplayfromthebasebypullingfirstfrom
the bottom and then the top until the two pieces unsnap.
TIP: If needed, wrap the wires
around a pencil or pen to keep
them from falling inside the wall.
REMOVE THE THERMOSTAT BACKPLATE:
UsingtheFingerPullAreas,pullthefront
housing away from the backplate.
W3/AUX
W2
W1/O/B
Y2
Y1
SENSOR
Backplate
PULL OUT WITH THUMBS IN THESE AREAS.
2) Positionthebaseagainstyour
wall, and determine if wall anchors
from current thermostat align with
screw locations of new base.
3) Ifbasedoesnotalignwithexisting
anchor holes, mark new screw
locations with a pencil.
Drywall:Drill3/16"holefortheanchor
Plaster:Drill7/32”holefortheanchor
4) Pullwiresthroughopeninginbase
and secure to the wall using
provided screws.
TIP:Usealeveltoensure
thermostat is properly aligned
before marking screw locations.